You think a robotic project is long and complex?
Let us explain how easy it can be, and what are the main project milestones!
Questions to ask yourself
Before investing your time in a robotic project, it is important to understand what are the trends of the material handling and AGV markets. Get an overview of the AGV player typologies and technologies by downloading our white paper
You’re thinking about a specific application for your future robots? Have a quick review of all the material flows our technology can robotize with an incredible product range.
This is the question our customers always ask first! As robots’ deployment requires an important investment from your company, it is mandatory for you to understand how a robotic project is priced.
Here is some key information we would like to share to help you out!
Before investing in a robot fleet, you need to calculate the potential savings generated by a robotic solution. To help you make accurate calculations, we are sharing with you some feedbacks we got directly from our technology end users, who generated much more savings than expected.
Describe your specifications
Here is a short list of advices you need to review before writing your robotic project specifications. Don’t miss it!
Choose a robotic supplier
Before making your final decision, here is a list of advises to choose a supplier based on your current needs, but not only!
You now know a little more about the players and technologies available, your robotic project takes shape and you want to see a robotic lift trucks in real life? It’s possible! Fill out this short form and make an appointment directly with one of our experts in one of our showrooms.
You have been in touch with one of our experts and need to see what a robot is capable of in your facility? It’s possible! Complete this short form and book an appointment!
Customers usually compare the cost of purchasing a robotic system with the drivers salary which represents 80% of a pallet movement cost. This is a start, but this is not the only element to take into account.
Today you can easily automate more than 80% of warehouse applications. Our simple ROI calculator sheet helps you to get a quick overview of your potential savings and calculate the ROI of your robotic investment.
Your first robot installation
Now that you’ve ordered your BALYO robotic solution, the whole project team will be focused on delivering the targeted performance level.
BALYO teams will drive your success by providing you with all the performance analysis you need (Statistic Tool) to understand how your robots and human operators behave.
All along your journey, we will recommend the best optimizations to successfully implement your robotized processes.
Kick-Off
The Kick-Off is the first step of the BALYO Project Management Process. Prior to the Kick-Off meeting, our project manager will prepare a list of documents including the application-specific customer specifications, technical specifications, the project risk analysis & the project planning. Then, these documents and milestones are presented to you during the Kick-Off meeting.
Before your installation
After an internal validation of the Software and Hardware bricks needed for your robotic project, the manufacturing process starts. In parallel, our project manager helps you prepare everything before robot commissioning: IT infrastructure & Software interfaces readiness, risk analysis recommendations implemented, site adaptations made, etc. Once the robots are produced, we perform an internal commissioning to test and validate all the safety and functional features before shipping the autonomous forklifts to your facility. All the results are obviously shared with you.
Once the robots are delivered to your facility, the job of the field engineer in charge of installing your BALYO system starts: mapping of the building, routes design, pick & drop points design, testing etc.
During this phase, we validate all functionalities with you, as well as safety and interfaces tests/reports in real conditions. We also train your teams to work alongside robots in a new cobotic environment. The ramp-up of your installation is ensured by measuring performances all along the process until the handover milestone, where you officially take the lead on your robotic system!
The handover formalizes transfer possession and risk from BALYO or its partners to the customer, meaning the system can be run without the presence of BALYO or its partners. The handover may contain “non-blocking open points” which will be dealt with in a final fixes phase. A non-blocking open point is an issue which does not hinder the system to achieve its contractual performance.
The purpose of the final fixes phase is to close open points raised during the handover. When the robotic system is fully compliant to its specifications, the Final Acceptance is signed by all parties.
Now your robots are fully operational, your main contact will be the service team. Organized by level of maintenance actions (base truck, hardware, software), our group of experts will support you whatever the issue is, ensuring continuity of your operations at the expected level of performance.
Thanks to the BALYO Statistics Tool, you can track the performance of your system. Based on efficiency standards such as OEE or PackML data, our monitoring tool gives you the ability to follow and optimize your installation on a daily basis.
Your next deployments
Usually, customers start their robotic investments with an installation of 3 robots (average). But keep in mind that our solution is designed to scale your operations up! After your first deployment, our experts are available to think about your future optimizations and new robotized material flows.
For example, after having automated supplies and removals of your production line, the next step can be to automate the vertical storage of your finished goods. Don’t forget, Robotics is a journey.